The scope of CCC certification for motor vehicles shall be in accordance with the requirements of the Implementing Rules for vehicles of category M, N and O (including complete vehicles and non-integrated vehicles). The certification according to the general safety standards eg GB 7258 "technical requirements for the safe operation of motor vehicles", For specific product inspection articles, please refer to the implementation rules of CNCA-C11-01: 2014 Automotive Annex 1 Type Test Projects and Standards.

1, How long does it take from the application to the receipt of the certificate?

90 days are set by law for cetification. According to experience, these sometimes take longer.

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: up to 10 man day per model series, depending of subparts certified

FI audit: up to 6 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is the audit conducted?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

  1. Application form
  2. License in copy- Vprašalnik s kratkimi informacijami o podjetju, proizvodnem procesu, seznamom glavnih proizvodnih obratov, seznamom instrumentov za testiranje glavnih snovi, dokazilom o registrirani blagovni znamki itd.
  3. Car structure and technical parameters
  4. COP control plan
  5. Declaration: how is type, series defined
  6. Declaration: how is VIN defined
  7. Explanation: we distinguish the different types by external marking
  8. Declaration: Operating instructions in Chinese
  9. COC certificate
  10. Review
  11. Quality Manual
  12. Quality system certificates in copy
  13. Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

Novice CCC

Izdana je nova izvedbena uredba CNCA-C11-01 za vozila Izdana je nova izvedbena uredba CNCA-C11-01 za vozila 04, 25-2020 -  17. aprila 2020 je bila sprejeta nova izvedbena uredba ...
Posodobljena poslovna področja delovanja kitajskih certifikacijskih organov CCC Posodobljena poslovna področja delovanja kitajskih certifikacijskih organov CCC 09, 14-2019 -  CNCA je izdala kitajska certifikacijska telesa CCC za eksplozijsko ...
Izdanih 10 novih kitajskih standardov GB Izdanih 10 novih kitajskih standardov GB 08, 16-2019 - Glede na nedavno sporočilo za javnost državnega sveta Ljudske republike Kitajske ...
Izdelki za protieksplozijsko zaščito, relevantni za CCC Izdelki za protieksplozijsko zaščito, relevantni za CCC 07, 17-2019 - Glede na nedavno objavo CNCA, zaščita pred eksplozijami ...
Izdanih 374 novih in revidiranih standardov GB Izdanih 374 novih in revidiranih standardov GB 07, 09-2019 - Glede na nedavno sporočilo za javnost državnega sveta Ljudske republike Kitajske ...
Izdanih 173 novih in revidiranih standardov GB Izdanih 173 novih in revidiranih standardov GB 06, 16-2019 - Glede na nedavno sporočilo za javnost državnega sveta Ljudske republike Kitajske ...
posodobljena poslovna področja akreditiranih preskusnih laboratorijev za izdelke CCC posodobljena poslovna področja akreditiranih preskusnih laboratorijev za izdelke CCC 05, 30-2019 - Glede na nedavno objavo CNCA, obseg poslovanja ...
Geely je v Nemčiji ustanovil center za inženirske raziskave in razvoj Geely je v Nemčiji ustanovil center za inženirske raziskave in razvoj 05, 18-2019 - Po poročanju kitajske tiskovne službe iz Pekinga z dne 16. maja ...
Objavljena izvedbena pravila za opremo mestnega železniškega prevoza Objavljena izvedbena pravila za opremo mestnega železniškega prevoza 05, 06-2019 - Glede na nedavno objavo kitajske certifikacijske organizacije ...
Posodobljeni poslovni obsegi preskusnih laboratorijev za kitajske izdelke CCC Posodobljeni poslovni obsegi preskusnih laboratorijev za kitajske izdelke CCC 04, 29-2019 - Poslovni obsegi izbranih testnih laboratorijev za kitajski CCC...

Podpora

Unterstützung

Delate v svojem tempu. Svoje projekte lahko upravljate samostojno prek našega portala in se pozanimate o osebni podpori. Zato smo se zavezali, da vam bomo dali možnost, da oblikujete lastne procese, ne da bi se morali odpovedati podpori prek našega portala.

Spletna administracija

Spletno upravljanje

Ponujamo vam možnost, da sami izvedete svoje postopke certificiranja, ne da bi se morali odpovedati znanju ali podpori izkušenih zaposlenih. Spletni sistem je zasnovan za različne certificiranja in vam ponuja tudi sezname pogosto zastavljenih vprašanj, pripravljene obrazce in tabele ter modul za razjasnitev odprtih vprašanj z enim od naših zaposlenih.

Sprememba potrdila

Sprememba potrdila

V našem hitrem času so spremembe v poslovnem življenju stalnica. Fiksne strukture, ki so se nekoč gradile dolga leta, je zdaj mogoče zelo hitro porušiti. Za to obstajajo notranji in zunanji razlogi. CS ponuja pregled skladnosti med spremembami.

Sodelovanje

sodelovanje

Ker imamo vsi omejene časovne in finančne zmožnosti ter želimo stranki ponuditi celovito storitev, je sodelovanje smiselno le med povezanimi organizacijami. Te imajo zanesljivo strukturo in dobro medosebno harmonijo.

Pojdi na vrh