1, How long does it take from the application to the receipt of the certificate?

90 days

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: 2 - 4 man day per model series

FI audit: 1 - 2 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is work audited?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

-Application form

License in copy

Questionnaire including brief information about the company, production process, list of core production facilities, list of core test instruments, proof of registered trademark, etc.

Car structure and technical parameters

-COP control plan

-Declaration: how is type, series defined

-Declaration: how is VIN defined

-Explanation: we distinguish the different types by external marking

-Declaration: Operating instructions in Chinese

-COC certificate

-Review

-Quality Manual

-Quality system certificates in copy

-Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

CCC News

posodobljeni so bili poslovni okviri akreditiranih preskuševalnih laboratorijev za izdelke CCC posodobljeni so bili poslovni okviri akreditiranih preskuševalnih laboratorijev za izdelke CCC 2019, 05-30 - glede na nedavno napoved CNCA, obseg poslovanja ...
Geely je ustanovil inženirski center za raziskave in razvoj v Nemčiji Geely je ustanovil inženirski center za raziskave in razvoj v Nemčiji 2019, 05-18 - Glede na China News Service Pekingu maja 16, da ...
Izvedena pravila za opremo mestnega železniškega tranzita Izvedena pravila za opremo mestnega železniškega tranzita 2019, 05-06 - Glede na nedavno objavo iz potrdila China ...
posodobljeni so bili poslovni okviri testnih laboratorijev za izdelke Kitajske CCC posodobljeni so bili poslovni okviri testnih laboratorijev za izdelke Kitajske CCC 2019, 04-29 - izbranih laboratorijev za kitajski CCC ...
21 nove in revidirane GB Standardi sprosti 21 nove in revidirane GB Standardi sprosti 2019, 04-19 - Po nedavnem tisku državnega sveta LRK, ...
177 nove in revidirane GB Standardi sprosti 177 nove in revidirane GB Standardi sprosti 2019, 04-04 - Po nedavnem tisku državnega sveta LRK, ...
Daimler bo za proizvodnjo električnih vozil vložil 500 milijonov evrov Daimler bo za proizvodnjo električnih vozil vložil 500 milijonov evrov 2019, 03-24 - Skupina Daimler bo vložila 500 milijonov evrov (približno ...
GB Standardi za Kitajsko CCC avtomobilskih izdelkov posodobljen GB Standardi za Kitajsko CCC avtomobilskih izdelkov posodobljen 2019, 03-17 - po nedavni napovedi CNCA (China National ...
Tesla Model 3 - kitajska tržna dostava Tesla Model 3 - kitajska tržna dostava 2019, 03-15 - Januarja 22, 2019, model 3 kitajske tržne dostave ...
Produkt retroreflektorja motornega vozila CCAP certifikacija znakov Produkt retroreflektorja motornega vozila CCAP certifikacija znakov 2019, 03-12 - Za uresničitev duha Kitajske nacionalne ...

Podpora

Unterstützung

Delaš na svojem ritmu. Svoje projekte lahko samostojno upravljate prek našega portala in se sprašujete o osebni podpori. Zato smo se zavezali k oblikovanju lastnih procesov

Spletna administracija

Spletna uprava

Ponujamo vam priložnost, da izvedete svoj certifikacijski postopek, ne da bi se morali odpovedati strokovnim znanjem ali izkušnjami zaposlenih. Spletni sistem je zasnovan za različne certifikate in vam ponuja zato sezname Pogosta vprašanja, kot tudi že pripravljene obrazce in tabele, kot tudi modul za razjasnitev odprtih vprašanj z enim od naših zaposlenih.

Spremenite certifikat

Spremenite certifikat

V našem hitrem času so spremembe v poslovnem življenju stalna spremljava. Lahko se zlomijo zelo hitro. Obstajajo notranji in zunanji razlogi za to. CS daje pregled skladnosti med spremembami.

Sodelovanje

sodelovanje

Imamo le omejen čas in finančno sposobnost ter želimo ponuditi celovito storitev, kooperacije pa imajo smisel samo med sorodnimi organizacijami. Ti imajo zanesljivo strukturo in dobro medosebno harmonijo.

Pojdi na vrh